Applied Engineering Sciences AESC 410
Supply Chain Management SCM 472
Presentation Schedule – 1st floor Anthony Hall, Room 1235
Time | Team Sponsor | Project Title |
---|---|---|
8:25 a.m. | Team 1-White Pine Engineering Solutions | Material Availability Forecasting |
8:50 a.m. | Team 2-I Lead Inc. | Commodity Management System |
9:15 a.m. | Team 3-Summit Consultants | Data Management for Global Automotive Aftermarket |
Break | ||
9:50 a.m. | Trane Technologies | Carbon Reduction in Transportation |
10:15 a.m. | Trane Technologies | Supply Chain Resiliency in Procurement |
10:40 a.m. | Harley-Davidson | Supplier Capacity Tool and Analysis |
Presentation Schedule – 1st floor Anthony Hall, Room 1255
Time | Team Sponsor | Project Title |
---|---|---|
8:25 a.m. | KLA | Supplier Master Data Management |
8:50 a.m. | KLA | Supplier Relationship Management Optimization |
9:15 a.m. | KLA | Best-in-Class Global Direct Materials Sourcing Process |
Break | ||
9:50 a.m. | Alpine Supply Chain Solutions | Storage Type Analysis & Goods- to-Person Evaluation |
10:15 a.m. | Applied Materials | Semiconductor Supplier Risk Index |
10:40 a.m. | Home Depot | On-Time and Complete Performance Improvement |
Presentation Schedule – 1st floor Anthony Hall, Room 1257
Time | Team Sponsor | Project Title |
---|---|---|
8:00 a.m. | Clarience Technologies | Evaluation & Recommendation of MRO Spend Vendors |
8:25 a.m. | Caterpillar Inc. | Geo Tracking Inside the Warehouse |
8:50 a.m. | Caterpillar Inc. | Optimal Facility Design |
9:15 a.m. | Caterpillar Inc. | Ergonomic Order Picking |
Break | ||
9:50 a.m. | American Axle & Manufacturing | TRMF – Forklift Free Facility |
10:15 a.m. | Snackwerks | Uptime Monitoring and Improvement Plan |
10:40 a.m. | John Deere | Global Steel Pricing Model |
11:05 a.m. | Meijer | Network Capacity Modeling |
Presentation Schedule – 1st floor Anthony Hall, Room 1260
Time | Team Sponsor | Project Title |
---|---|---|
8:25 a.m. | SLB | Analyzing Price Cycles in Oil Field Chemicals Market |
8:50 a.m. | SLB | Mitigating Commodity Price Volatility in Supply Chains |
9:15 a.m. | SLB | Framework for Supplier Rationalization |
Break | ||
9:50 a.m. | NASA | Psyche Mission: Art & Exhibit Archiving System |
10:15 a.m. | NASA | Psyche Mission: Capstone Marketplace |
10:40 a.m. | NASA | Psyche Mission: Public Arts Activity Analysis |
Civil & Environmental Engineering CE 495
Presentation Schedule – 1st floor Engineering Building, Room 1225
Time | Team | Room 1225 |
---|---|---|
8:00 a.m. | Team 1 – Red Cedar Consultants | First Floor Room 1225 |
9:20 a.m. | Team 2 – Champions Engineering Group | First Floor Room 1225 |
10:40 a.m | Team 3 – CJ WATAC Construction | First Floor Room 1225 |
Presentation Schedule – 1st floor Engineering Building, Room 1230
Time | Team | Room 1230 |
---|---|---|
8:00 a.m. | Team 4 – Green Engineering Solutions | First Floor Room 1230 |
9:20 a.m. | Team 6 – Envision Construction | First Floor Room 1230 |
10:40 a.m. | Team 7 – East Lansing Consultants | First Floor Room 1230 |
Presentation Schedule – 1st floor Engineering Building, Room 1234
Time | Team | Room 1234 |
---|---|---|
8:00 a.m. | Team 5 – JPECS Engineering | First Floor Room 1234 |
9:20 a.m. | Team 8 – Spartan Engineering Solutions | First Floor Room 1234 |
10:40 a.m. | Team 9 – GREEN (Great Lakes Region Environmental Engineering Network) | First Floor Room 1234 |
Presentation Schedule – 2nd floor Engineering Building, Room 2243
Time | Team | Room 2243 |
---|---|---|
8:00 a.m. | Team 10 – Truss US Engineering | Second Floor Room 2243 |
9:20 a.m. | Team 11 – Barn-Hill Consultants | Second Floor Room 2243 |
10:40 a.m. | Team 12 – Spartan Consultants | Second Floor Room 2243 |
Materials Science & Engineering MSE 466
Presentation Schedule – 1st floor Engineering Building, Room 1145
Time | Team | Project |
---|---|---|
8:30 a.m. | Break Check | Examination of a Failed Brake Pipe/Junction of a 2006 Buick Rendevous CXL |
9:00 a.m. | Optical Zyllusion | Examining the Cellulose Acetate (Zylonite) Fracture of Glass Frames |
9:30 a.m. | 90-Degree Dream Team | Failure Analysis of a Metal Forming Die |
10:00 a.m. | The Twisters | Evaluating the Failure of a 5:1 Motor Speed Reducer |
10:30 a.m. | The Spraying Squad | Deburring Water Nozzle Failure Analysis |
11:00 a.m. | Kelvin and the Chipmunks | Failure Analysis of Fiber Optic Cables |
Electrical and Computer Engineering ECE 480
Presentation Schedule – 2nd floor Engineering Building, Room 2205
Time | Team Sponsor | Project Title |
---|---|---|
8:30 a.m. | MSU Formula SAE/Tesla | Battery Management System |
8:50 a.m. | MSU Solar Racing Team | Active Cell Balancing Battery Management System |
9:10 a.m. | MSU Solar Racing Team | Field Oriented Control for Solar Motor Inverter |
9:30 a.m. | Our Next Energy | Battery Cell Simulator |
9:50 a.m. | Fraunhofer USA | Microwave Detector & Photodiode Safety Interlock |
10:10 a.m. | Break | |
10:20 a.m. | MSU Bikes Service Center | MSU Bikes Green Box |
10:40 a.m. | Great Lakes Crystal Technologies | Measuring Diamond NV Center Charged States |
11:00 a.m. | MSU IPF Power and Water | Big Data Analysis for Efficiency in Utility Generation |
11:20 a.m. | FRIB | SRAM-Based Dosimetry for Heavy Ion Detection |
Presentation Schedule – 2nd floor Engineering Building, Room 2320
Time | Team Sponsor | Project Title |
---|---|---|
8:30 a.m. | FRIB | Variable Energy Degradation Stage |
8:50 a.m. | ECE NDE Lab | Robotic Arm Object Reconstruction for NDE |
9:10 a.m. | ECE NDE Lab | Aerial Drone for NDE Applications |
9:30 a.m. | MSU ECE Department | Scaled Down Autonomous Bus with Self-Parking Ability |
9:50 a.m. | ECE Smart Lab | Scaled Teleoperated Vehicle for Smart Vehicle System |
10:10 a.m. | Break | |
10:20 a.m. | ECE Smart Lab | Visual Inertial Odometry for Underwater Laboratory |
10:40 a.m. | ECE Diamond Labs | Diamond Plate Thickness Measurement |
11:00 a.m. | MSU ECE Department | Wirelessly Powered Backup Camera |
11:20 a.m. | MSU Biomedical Engineering | Wind Tunnel for Molecular Communication |
Mechanical Engineering ME 481
Presentation Schedule – 1st floor Engineering Building, Room 1202
Time | Team Sponsor | Project Title |
---|---|---|
8:00 a.m. | MSU College of Engineering | Combined Easel and Board Storage Cart Design |
8:30 a.m. | MSU College of Engineering | Combined Easel and Board Storage Cart Design |
9:00 a.m. | MSU College of Engineering | Easel Storage Cart Development and Production Build |
9:30 a.m. | MSU Adaptive Sports & Recreation Club | Increased Roller Sled Mobility: Phase IV |
10:00 a.m. | MSU Adaptive Sports & Recreation Club | Inclusive Sports Wheelchair: Phase VIII |
10:30 a.m. | MSU Adaptive Sports & Recreation Club | Sled Hockey Transfer Platform: Phase VI |
11:00 a.m. | MSU Adaptive Sports & Recreation Club | 3-Wheel Drive System for Scooter: Phase 2 |
Presentation Schedule – 1st floor Engineering Building, Room 1220
Time | Team Sponsor | Project Title |
---|---|---|
8:00 a.m. | Michigan AgrAbility | Tractor Manlift Finite Element Analysis |
8:30 a.m. | MSU Solar Car Team | Electric Vehicle Powertrain Development |
9:00 a.m. | PPG Industries/MSU Formula Racing Team | Carbon Fiber Reinforced Polymer Wheels |
9:30 a.m. | Michigan Chestnut Industry | Chestnut Harvester Design |
10:00 a.m. | MSU Department of Mechanical Engineering | HPVC Build Table Design and Fabrication |
10:30 a.m. | MSU Department of Theatre | Paint Can Shaker |
Presentation Schedule – 1st floor Engineering Building, Room 1300
Time | Team Sponsor | Project Title |
---|---|---|
8:00 a.m. | Battleship New Jersey Museum & Memorial | USS Monitor Mooring System |
8:30 a.m. | MSU AIDED Team | Delivery Drone to Bus Charging Latch |
9:00 a.m. | Our Next Energy | Trailer Hitch Force via Strain Gage |
9:30 a.m. | Cleveland-Cliffs, Inc. | Cart Design for Moving Production Steel Rolls |
10:00 a.m. | Cleveland-Cliffs, Inc. | Cart Design for Moving Production Steel Rolls |
10:30 a.m. | Hitachi Astemo Americas, Inc. | Performance Characterization of a TMD for Vehicles |
Presentation Schedule – 2nd floor Engineering Building, Room 2435
Time | Team Sponsor | Project Title |
---|---|---|
8:00 a.m. | Alro Steel | Plasma Burning Facility Process Improvements |
8:30 a.m. | Asahi Kasei Plastics North America | Strand Management Application Process Improvements |
9:00 a.m. | Wheels on Rails LLC | Rail Bike Design |
9:30 a.m. | Wheels on Rails LLC | Rail Bike Design |
10:00 a.m. | MSU Department of Mechanical Engineering | Design and Analysis of a Four-Stroke Hydrogen Engine |
10:30 a.m. | Cobra AERO | Design of Two-Stroke Cycle Power Dense Engine |
Presentation Schedule – 3rd floor Engineering Building, Room 3540
Time | Team Sponsor | Project Title |
---|---|---|
8:00 a.m. | UV-C Safe, Inc. | Germicidal Transaction Portal |
8:30 a.m. | UV-C Safe, Inc. | Home Application |
9:00 a.m. | UV-C Safe, Inc. | Germicidal Card Reader Cleaner |
9:30 a.m. | MSU Department of Mechanical Engineering | Crisis Window Replacement |
10:00 a.m. | General Motors | Sound Design for Electric Vehicles |
10:30 a.m. | Consumers Energy | Turboexpander Feasibility Study |